Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2022-2032-013


Contract Details
Contract Number
2022-2032
Region
Central
Tender Owner
MTO Regional
Location
Oakville/QEW EB Truck Inspection Station (GWP 2055-19-00)
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Improvements Including Granular Base, Hot Mix Paving, Concrete Barrier, Drainage & Grading.
Tender Instructions
Contract Dates
Tender Advertise
26-May-2022
Tender Opening
07-Jul-2022 at 10:00:00 AM
TRF Submission Opening
09-Jun-2022
TRF Submission Closing
01-Jul-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
22-Jun-2022 at 01:39:08 PM
Type
Other
Subject
Oil Grit Separator
Enquiry
The oil-grit separator is referred to a Stormceptor on the drawing. Please provide the model of Stormceptor to be used. Is an equivalent product acceptable?

Response Details
Response Status
Completed
Response Date
23-Jun-2022 at 06:11:22 PM
Response
Good afternoon. The Oil-grit Separator/Stormceptor shall meet system performance specifications required in the contract documents. Page 120 of 128 mentions the system performance specifications required for the Oil-grit Separator/Stormceptor.