View Enquiry: BE 2022-3008-031


Contract Details
Contract Number
2022-3008
Region
West
Tender Owner
MTO Capital
Location
Highway 401 and Highway 4 (Colonel Talbot Road) Interchange Reconfiguration and Highway 4 (Colonel Talbot Road) and Glanworth Drive Underpass Replacements
Highway
401
Length
4
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN-BUILD MAJOR - Grading, Drainage, Granular Base, Hot Mix Paving, Structures, and Electrical
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: April 6, 2022
Contract Dates
Tender Advertise
23-Feb-2022
Tender Opening
19-Oct-2022 at 01:30:00 PM
TRF Submission Opening
21-Sep-2022
TRF Submission Closing
14-Oct-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
13-Jun-2022 at 09:45:47 AM
Type
Other
Subject
Integral Abutments
Enquiry
The RFP states that the Highway 4 (Colonel Talbot Road) Underpass (Site #19X-0405/B0) and Glanworth Drive Underpass (Site #19X-0406/B0) shall have fully open integral abutments. In Section 2.4.8.1.3, the RFP states that Glanworth Drive Underpass may be constructed with integral abutments on piles in two permitted configurations: Abutment Foundation Option A – Conventional Integral or Abutment Foundation Option B – Integral piles with footing. Can the Ministry please confirm if both Abutment Foundation Option A and Option B can also be considered for the Highway 4 (Colonel Talbot Road) Underpass?

Response Details
Response Status
Completed
Response Date
23-Jun-2022 at 01:39:22 PM
Response
The Highway 4 (Colonel Talbot Road) Underpass shall be constructed in accordance with Section 7- Proposed Replacement and the Preliminary General Arrangement Drawing (Appendix C) in the Colonel Talbot Road Structural Design Report (Final – Nov 2020), which indicates deep driven pile foundations. A footed pile approach, similar to Glanworth Drive Underpass–Option B may be submitted as an Alternative Technical Concept for further review. Design considerations shall include, but not limited to: total and differential embankment settlement, staging, minimum pile length, skew effects, and roadway protection.