Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2021-5168-077


Contract Details
Contract Number
2021-5168
Region
Northeastern
Tender Owner
MTO Capital
Location
Highway 631, from Becker Road in Hornepayne, northerly to Negagamisis Narrows Bridge, 31.7 km
Highway
631
Length
31.7
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Design Build Minor - Grading, Drainage, Hot Mix Paving and Structures
Tender Instructions
EXPRESSION OF INTEREST - must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. Local time on March 9, 2022
Contract Dates
Tender Advertise
26-Jan-2022
Tender Opening
06-Jul-2022 at 01:30:00 PM
TRF Submission Opening
08-Jun-2022
TRF Submission Closing
01-Jul-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
07-Jun-2022 at 11:43:00 AM
Type
Other
Subject
High fill of the culverts and Foundation Investigation
Enquiry
Section 2.4.9.1 of the RFP indicates the foundation scope of the project for the three bridges and the Hornepayne Creek structural Culvert. Could the Ministry please confirm the foundation scope for high fill non-structural culverts above 3 m of embankment height?

Response Details
Response Status
Completed
Response Date
07-Jun-2022 at 01:57:30 PM
Response
As per the RFP, Section 2.4.6.1 – Drainage Design and Construction, the Design-Builder shall review the culverts identified below to determine the replacement requirements and shall consider all possible options/costs for the replacement (detour, roadway protection, trenchless technologies, etc.) and determine the most appropriate option as part of the Drainage Report. Therefore, the foundation scope for non-structural culverts is dependent on the Design-Builder’s design.