Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2022-3008-015


Contract Details
Contract Number
2022-3008
Region
West
Tender Owner
MTO Capital
Location
Highway 401 and Highway 4 (Colonel Talbot Road) Interchange Reconfiguration and Highway 4 (Colonel Talbot Road) and Glanworth Drive Underpass Replacements
Highway
401
Length
4
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN-BUILD MAJOR - Grading, Drainage, Granular Base, Hot Mix Paving, Structures, and Electrical
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: April 6, 2022
Contract Dates
Tender Advertise
23-Feb-2022
Tender Opening
19-Oct-2022 at 01:30:00 PM
TRF Submission Opening
21-Sep-2022
TRF Submission Closing
14-Oct-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
03-Jun-2022 at 10:17:01 AM
Type
Other
Subject
DB RFP 2.4.10.1.1 Permanent / Temporary Pavement Markings
Enquiry
DB RFP 2.4.10.1.1 Permanent / Temporary Pavement Markings states that “All pavement markings (temporary and permanent) shall be placed by September 30th, unless otherwise directed by the Contract Administrator”. September 30th of any given year is still early in the construction season to limit both permanent and temporary pavement markings. MTO is requested to change this clause such that the requirements for pavement markings should be based on conditions/temperatures/etc.

Response Details
Response Status
Completed
Response Date
04-Jul-2022 at 02:58:20 PM
Response
Please see Addendum #1. The September 30 requirement has been removed for Temporary Pavement Markings however will remain in place for Permanent Pavement Markings. This requirement is to ensure that pavement markings are placed in optimal temperature, humidity, etc., to prevent premature failure. Permanent Pavement Markings can be placed beyond this date given approval from the Contract Administrator.