View Enquiry: BE 2021-5168-068


Contract Details
Contract Number
2021-5168
Region
Northeastern
Tender Owner
MTO Capital
Location
Highway 631, from Becker Road in Hornepayne, northerly to Negagamisis Narrows Bridge, 31.7 km
Highway
631
Length
31.7
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Design Build Minor - Grading, Drainage, Hot Mix Paving and Structures
Tender Instructions
EXPRESSION OF INTEREST - must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. Local time on March 9, 2022
Contract Dates
Tender Advertise
26-Jan-2022
Tender Opening
06-Jul-2022 at 01:30:00 PM
TRF Submission Opening
08-Jun-2022
TRF Submission Closing
01-Jul-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
02-Jun-2022 at 09:55:35 PM
Type
Other
Subject
Bridge Rehabilitation Scope
Enquiry
Section 2.4.8.1 (page 81) – The DB RFP indicates that the rehabilitations of the Shekak and West Beaton River Bridges include converting to semi-integral configuration; however, the DB RFP later suggests that “The Design-Builder shall verify and confirm the scope for rehabilitation…”, and that “Durability details such as conversion to semi-integral abutments… shall be as per MTO corrosion protection policy…”. In keeping with the spirit of a Design Build Contract, can the Ministry confirm that the determination of whether to convert these sites to semi-integral will remain the responsibility of the Design-Builder and / or clarify what administrative process is required during the DB Contract to resolve this conflict?

Response Details
Response Status
Completed
Response Date
08-Jun-2022 at 03:52:54 PM
Response
The bridge shall be converted to semi-integral configuration as per RFP. The use of GFRP in the parapet walls shall be as per MTO corrosion protection policy.