View Enquiry: BE 2021-5168-047


Contract Details
Contract Number
2021-5168
Region
Northeastern
Tender Owner
MTO Capital
Location
Highway 631, from Becker Road in Hornepayne, northerly to Negagamisis Narrows Bridge, 31.7 km
Highway
631
Length
31.7
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Design Build Minor - Grading, Drainage, Hot Mix Paving and Structures
Tender Instructions
EXPRESSION OF INTEREST - must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. Local time on March 9, 2022
Contract Dates
Tender Advertise
26-Jan-2022
Tender Opening
06-Jul-2022 at 01:30:00 PM
TRF Submission Opening
08-Jun-2022
TRF Submission Closing
01-Jul-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
27-May-2022 at 04:30:14 PM
Type
Other
Subject
Standards of Portable Temporary Traffic Signals (PTTS)
Enquiry
As per Sheet 29 of Contract Drawings provided in RFP “ GWP 5569-09-00 Contract 2018-5125 Drawings”, the distance between PT1 and PT2 exceeds the 366m maximum distance required stated in “Use of Portable Temporary Traffic Signals (PTTS) (Memo TO #2016-01, November 30, 2016) With Attached Appendix A: Layout Drawings 1 to 4”. Can the Ministry please provide direction as the design does not meet the standards specified above?

Response Details
Response Status
Completed
Response Date
08-Jun-2022 at 03:50:52 PM
Response
If Portable Temporary Traffic Signals are utilized for the replacement of the Nagagamisis Lake Narrows Bridge (Site #38N-00) the staging detour may require more than the recommended 366 metres between Portable Temporary Traffic Signals as outlined in “Use of Portable Temporary Traffic Signals (PTTS) (Memo TO #2016-01, November 30, 2016).” The only ministry approved deviation from Memo TO #2016-01 is the exceeded distance between two interconnected PTTS devices to a maximum distance of 403 metres at the Nagagamisis Lake Narrow Bridge (Site #38N-00). It is the responsibility of the Design Builder/Contractor that the PTTS equipment has the capability to communicate the extended distance.