View Enquiry: BE 2021-5168-024


Contract Details
Contract Number
2021-5168
Region
Northeastern
Tender Owner
MTO Capital
Location
Highway 631, from Becker Road in Hornepayne, northerly to Negagamisis Narrows Bridge, 31.7 km
Highway
631
Length
31.7
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Design Build Minor - Grading, Drainage, Hot Mix Paving and Structures
Tender Instructions
EXPRESSION OF INTEREST - must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. Local time on March 9, 2022
Contract Dates
Tender Advertise
26-Jan-2022
Tender Opening
06-Jul-2022 at 01:30:00 PM
TRF Submission Opening
08-Jun-2022
TRF Submission Closing
01-Jul-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
12-May-2022 at 04:01:38 PM
Type
Other
Subject
Poor Performing Areas
Enquiry
Page 77 of the RFP indicates that the design-builder is responsible for developing and implementing repair methodology for the poor performing areas indicated. A review of the geotechnical investigation provided with the RFP indicates that many of these poor performing areas are resulting from trapped water due to the elevation of the subgrade at the shoulder being higher than the subgrade of the highway – creating a “bath-tubbing effect”. To achieve positive drainage and eliminate the root cause of the poor performance, substantial removal of the existing shoulders to lower the subgrade to match the highway subgrade elevation is required. Furthermore, the lowering of the subgrade through the shoulder will necessitate the lowering of the ditch inverts to match. The geotechnical information provided indicates the presence of rock in some of these areas, which will require extensive rock blasting and excavation. Can the Ministry please clarify if the intended scope of work includes blasting and rock removals to address the poorly performing areas and if this scope has been included in the workload rating?

Response Details
Response Status
Completed
Response Date
20-May-2022 at 05:09:19 PM
Response
The Ministry will not be providing direction for the treatment of the poor performing areas. The Design Build service provider will be required to provide a treatment design for each poor performing area. The Pavement investigation report can found be in the supplied information in the DB RFP.