Response Status
Completed
Response Date
20-May-2022 at 05:01:28 PM
As per the RFP requirements, Performance Specification (PERF) 2272 shall govern the permitted grade raise allowance. Also, as per Design Build RFP limitations, The Preliminary Geotechnical Assessment (PGA) found within the reference documents is used by the ministry for very preliminary investigations / estimating purposes and shall not be used for direction for the Design Builder’s design. As per RFP, Section 1.10 – Ministry Supplied Information, any “reference concepts” or “preliminary designs” included in Appendix C are for information purposes only. It is the Design-Builder’s responsibility to generate alternatives and develop the design for the preferred alternative.