Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2022-4009-013


Contract Details
Contract Number
2022-4009
Region
Eastern
Tender Owner
MTO Capital
Location
Highway 417 from 0.1km west of Aviation Parkway to 0.5km west of Innes Road and from 0.1km West of Walkley Road to 0.1km East of Walkley Road
Highway
417
Length
5.1
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, and Structural
Tender Instructions
Contract Dates
Tender Advertise
30-Mar-2022
Tender Opening
17-May-2022 at 03:00:00 PM
TRF Submission Opening
19-Apr-2022
TRF Submission Closing
13-May-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
05-May-2022 at 04:18:45 PM
Type
Contract Drawing
Subject
Jacking
Enquiry
As per jacking and bearing details on drawing sheet 144 & 145 , there are two jacking points at each bearing location. Should the jacking load be considered 100% at each jacking point or distributed evenly between the two jacking points at each bearing location?

Response Details
Response Status
Completed
Response Date
10-May-2022 at 09:47:06 AM
Response
The jacking loads provided on Sheet 144 Jacking load table are considered 100% at each jacking point and should not be divided into two.