Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2021-3037-109


Contract Details
Contract Number
2021-3037
Region
West
Tender Owner
MTO Capital
Location
From 0.9 km west of Middlesex Rd. 30 (Putnam Rd.) to 0.2 km west of Highway 19 (Harris St.)
Highway
401
Length
10
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Rehabilitation
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 23, 2021.
Contract Dates
Tender Advertise
20-Oct-2021
Tender Opening
01-Mar-2022 at 03:00:00 PM
TRF Submission Opening
01-Feb-2022
TRF Submission Closing
25-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
18-Feb-2022 at 09:00:14 AM
Type
Other
Subject
Pavement Design
Enquiry
Can the Ministry please confirm that additional pavement investigation and design is not required to evaluate the mill and pave rehabilitation strategy for the Highway 401 mainline rehabilitation areas within the limits identified in the RFP, i.e. to determine if full-depth reconstruction is required in these areas?

Response Details
Response Status
Completed
Response Date
24-Feb-2022 at 07:50:43 AM
Response
The Ministry confirms that no additional pavement investigation and/or design will be required to evaluate the mill and pave rehabilitation strategy for the Highway 401 mainline rehabilitation areas within the limits identified in the RFP.