View Enquiry: BE 2021-3037-103


Contract Details
Contract Number
2021-3037
Region
West
Tender Owner
MTO Capital
Location
From 0.9 km west of Middlesex Rd. 30 (Putnam Rd.) to 0.2 km west of Highway 19 (Harris St.)
Highway
401
Length
10
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Rehabilitation
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 23, 2021.
Contract Dates
Tender Advertise
20-Oct-2021
Tender Opening
01-Mar-2022 at 03:00:00 PM
TRF Submission Opening
01-Feb-2022
TRF Submission Closing
25-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
02-Feb-2022 at 02:53:44 PM
Type
Other
Subject
Section 2.4.8.2 Bridge Design
Enquiry
Section 2.4.8.2 Bridge Design and Construction state that "The Ministry warrants that the Proponent can rely upon the information contained in the Detailed/Construction Drawings in accordance with GC 2.01, although the Proponent still needs to verify the information and undertake the work to construct these rehabilitations. The Proponent will not be responsible for the loss or damage that may occur because of errors in the Detailed/Construction Drawings, except those arising from the acts or omissions of the Proponent. The Design-Builder is responsible for assessing and validating the DBRR and construction drawings and developing and advancing them through detailed design. All quantities and costs provided are for information purposes only. The Design-Builder shall remain responsible for the traffic staging during construction, costs, and quantity estimates." Can the MTO confirm for bidding purposes that quantities given in the SDR reports for each of the structures, are accurate and the contractor will be paid by the unit price for the work completed? Also, any additional items that are missing from the quantity lists provided will be paid in addition such as road protection and required Granular A?

Response Details
Response Status
Completed
Response Date
24-Feb-2022 at 07:51:30 AM
Response
The ministry confirms that for bidding purposes the quantities given in the SDR reports for each of the structure, are accurate and the contractor will be paid by the unit price for the work completed. The ministry also confirms that any additional items that are missing from the quantity lists provided will be paid by the unit price for the work completed.