View Enquiry: BE 2021-3037-083


Contract Details
Contract Number
2021-3037
Region
West
Tender Owner
MTO Capital
Location
From 0.9 km west of Middlesex Rd. 30 (Putnam Rd.) to 0.2 km west of Highway 19 (Harris St.)
Highway
401
Length
10
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Rehabilitation
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 23, 2021.
Contract Dates
Tender Advertise
20-Oct-2021
Tender Opening
01-Mar-2022 at 03:00:00 PM
TRF Submission Opening
01-Feb-2022
TRF Submission Closing
25-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
26-Jan-2022 at 11:36:25 AM
Type
Other
Subject
Culvert
Enquiry
Attached is actual pictures of the 300mm dia. culvert to be replaced at 24+450 and 24+950. The 300mm pipe is inside the existing rigid frame open bottom concrete culvert. Please clarify if the new 300mm dia. pipe is to be installed inside the existing rigid frame concrete culvert. Page 38 of DBRR notes "install new section of pipe adjacent to the centreline culvert". Is the Ministry referring to adjacent to the existing 300mm culvert, or adjacent to the rigid frame culvert itself. Also, please clarify if the DB contractor has to remove the old 300mm CSP. If it gets removed, can the DB contractor simply install in the current position rather than adjacent as noted in the RFP?
Attachment(s)

Response Details
Response Status
Completed
Response Date
03-Feb-2022 at 01:09:34 PM
Response
The 300mm dia. culvert to be replaced at 24+450 and 24+950, is to be moved outside of the barrel of Centerline Culverts C5 and C6 and installed adjacent to the Centerline Culvert C5 and C6 , and connected to the existing upstream and downstream pipe within the MTO right-of-way, as referenced in RFP and Culvert Inspection Report.