Enquiry Date
18-Jan-2022 at 01:23:29 PM
Type
Other
Subject
Draft Foundation Technical Memo
The Draft Foundation Technical memo (document 4) is limited to skeleton logs and preliminary recommendations which appear to be based on the limited data. The final borehole records, including lab testing, and drawings are required to confirm the soil stratigraphy and hence permit the analysis required on this project. It is also noted that the recently released FIDR (document 38) does not cover the bridge structure, and only the culvert replacement. Could MTO please advise if the final borehole records, including lab testing, and drawings, will they be made available?