Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2021-3037-035


Contract Details
Contract Number
2021-3037
Region
West
Tender Owner
MTO Capital
Location
From 0.9 km west of Middlesex Rd. 30 (Putnam Rd.) to 0.2 km west of Highway 19 (Harris St.)
Highway
401
Length
10
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Rehabilitation
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 23, 2021.
Contract Dates
Tender Advertise
20-Oct-2021
Tender Opening
01-Mar-2022 at 03:00:00 PM
TRF Submission Opening
01-Feb-2022
TRF Submission Closing
25-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
13-Jan-2022 at 11:06:55 AM
Type
Other
Subject
Drainage
Enquiry
Section 6.6.4 of the DBRR provides recommendations for the culverts at the interchanges and the side roads. Clause 2.4.6.2 of the RFP identifies that the Design-Builder shall be responsible for undertaking the hydraulic analysis for all culverts associated with the interchange ramps and side roads, and completing the detailed design and construction of all culverts. Can the Ministry please confirm the scope of work shall be based on the information provided in the DBRR and no further hydraulic analysis is required.

Response Details
Response Status
Completed
Response Date
01-Feb-2022 at 04:16:25 PM
Response
The Design-Builder shall be responsible for undertaking the hydraulic analysis for all culverts associated with the interchange ramps and side roads, and completing the detailed design and construction of all culverts.