View Enquiry: BE 2022-2001-038


Contract Details
Contract Number
2022-2001
Region
Central
Tender Owner
MTO Capital
Location
From Hwy 427 to Islington Avenue, Including Dixon/Martin Grove Interchange
Highway
401
Length
2.576
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural Length: 4.6 Km
Tender Instructions
Contract Dates
Tender Advertise
10-Nov-2021
Tender Opening
20-Jan-2022 at 01:30:00 PM
TRF Submission Opening
23-Dec-2021
TRF Submission Closing
14-Jan-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
07-Jan-2022 at 03:09:41 PM
Type
General Conditions
Subject
Existing Condition
Enquiry
Please confirm the existing duct installation system for Dixon Road and Martin Grove road (sheet 324), Dixon Road and Ramp 401 EB-Dixon Road E/W (sheet 325) and Martin Grove road and Ramp 401 WB-Martin Grove N/S (sheet 326). Please confirm if the existing duct system is concrete encased, steel encased or directional bore as some of new installation is overlapping with an existing.

Response Details
Response Status
Completed
Response Date
11-Jan-2022 at 07:54:07 AM
Response
Existing duct system locations were established based on subsurface utility survey and Toronto Hydro gear diagrams. No construction or as-built information could be obtained, therefore we cannot confirm if the existing duct systems are concrete encased, steel encased or directional bore.