View Enquiry: BE 2021-2124-040


Contract Details
Contract Number
2021-2124
Region
Central
Tender Owner
MTO Capital
Location
FROM 200M SOUTH OF BRADFORD WEST GWILLIMBURY 9th LINE INTERSECTION TO NORTH OF BRADFORD WEST GWILLIMBURY 8th LINE INTERSECTION
Highway
7317
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Bradford Bypass – Simcoe County Road 4 (Yonge Street) Underpass.
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 9, 2021.
Contract Dates
Tender Advertise
08-Oct-2021
Tender Opening
09-Feb-2022 at 01:30:00 PM
TRF Submission Opening
12-Jan-2022
TRF Submission Closing
04-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
16-Dec-2021 at 10:39:49 AM
Type
Special Conditions
Subject
O Reg 697/21
Enquiry
Section 2.4.11.1 indicates that the Design Builder shall meet requirements of the Early Works Process of O. Reg, 697/21. Can the Ministry confirm which components have been completed as part of DB ready phase and which outstanding requirements are to be completed by the Design Builder?

Response Details
Response Status
Completed
Response Date
23-Dec-2021 at 02:17:12 PM
Response
MTO will complete the Finals of the following reports based on the DBR Reference Concept design: • Early Works Report (Draft/Final) per O. Reg 697/21 • Stage 2 Archaeological Assessment Report • Early Works Stage 3 Archaeological Assessment per O. Reg. 697/21 for applicable sites • Stage 4 Archaeological Assessment Report for applicable sites • Early Works Stormwater Management Plan per O. Reg. 697/21 • Early Works Groundwater Protection and Well Monitoring Plan per O. Reg. 697/21 • Early Works Noise Report per O. Reg. 697/21 • Fish and Fish Habitat Impact Assessment Memorandum • Terrestrial Impact Assessment Memorandum • Hydrogeological Investigation Report • Waste and Excess Materials Management Plan • Climate Change Report The DB Team shall be responsible for the completion of the following reports: • Early Works Report Addendum, if required • Updates to any of the above reports should changes to the design require reassessment of potential impacts and mitigation measures • Early Works Stormwater Management Plan • Early Works Groundwater Protection and Well Monitoring Plan