View Enquiry: BE 2021-2124-039


Contract Details
Contract Number
2021-2124
Region
Central
Tender Owner
MTO Capital
Location
FROM 200M SOUTH OF BRADFORD WEST GWILLIMBURY 9th LINE INTERSECTION TO NORTH OF BRADFORD WEST GWILLIMBURY 8th LINE INTERSECTION
Highway
7317
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Bradford Bypass – Simcoe County Road 4 (Yonge Street) Underpass.
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 9, 2021.
Contract Dates
Tender Advertise
08-Oct-2021
Tender Opening
09-Feb-2022 at 01:30:00 PM
TRF Submission Opening
12-Jan-2022
TRF Submission Closing
04-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
16-Dec-2021 at 10:38:31 AM
Type
Special Conditions
Subject
Design Submissions
Enquiry
Section 2.2.2 Design submissions in Addendum 2 lists the following reports: • Early Works Report (Draft/Final/Amendment) • Early Works Stage III Archaeological Assessment • Early Works Stormwater Management Plan • Early Works Groundwater Protection and Well Monitoring Plan • Early Works Noise Report • Fish and Fish Habitat Impact Assessment • Terrestrial Impact Assessment • Hydrogeological Investigation • Waste and Excess Materials Management Plan • Climate Change Memorandum • Noise Assessment Report We have two questions: Firstly, most of these reports, particularly the Early Works reports are listed on page 6 of Addendum #2 in Table C-1-1 as documents that are expected to be provided during the RFP phase. Can the Ministry please confirm that the Design Builder is responsible for completing FINAL versions of these reports ? Secondly, is the Noise Assessment Report meant to be a separate deliverable from the Early Works Noise Report?

Response Details
Response Status
Completed
Response Date
29-Dec-2021 at 11:15:19 AM
Response
MTO will complete the final versions of most of the reports based on information available from the DBR Reference Concept design. The DB Team shall be responsible for the completion of the following reports: • Early Works Report Addendum, if required • Updates to any of the above reports should changes to the design require reassessment of potential impacts and mitigation measures • Early Works Stormwater Management Plan • Early Works Groundwater Protection and Well Monitoring Plan The Noise Assessment Report and Early Works Noise Report are the same document. The bullet in Section 2.2.2 listing the Noise Assessment Report was redundant. A CR4 Early Works Traffic Noise Report and a CR4 Early Works Construction Noise Report were provided to bidders, combined they form the CR4 Early Works Noise Report.