View Enquiry: BE 2021-2124-035


Contract Details
Contract Number
2021-2124
Region
Central
Tender Owner
MTO Capital
Location
FROM 200M SOUTH OF BRADFORD WEST GWILLIMBURY 9th LINE INTERSECTION TO NORTH OF BRADFORD WEST GWILLIMBURY 8th LINE INTERSECTION
Highway
7317
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Bradford Bypass – Simcoe County Road 4 (Yonge Street) Underpass.
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 9, 2021.
Contract Dates
Tender Advertise
08-Oct-2021
Tender Opening
09-Feb-2022 at 01:30:00 PM
TRF Submission Opening
12-Jan-2022
TRF Submission Closing
04-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
16-Dec-2021 at 10:20:04 AM
Type
Special Conditions
Subject
Bridge Aesthetics
Enquiry
Addendum 2 Section 2.4.8.5 “Aesthetics” states that the bridge shall be designed for “Level 2-Medium” aesthetics classification according to the Aesthetic Guidelines, and also states the aesthetic requirements for the design of the pier with the statements... "The pier should be proportioned to stand out and create a crossing that is distinguishable and can be associated with the Bradford Bypass. It should be recognizable, and noticeably different in form than most typical underpass bridges". Additionally, in document 11 of Table C-1, the SDR under Summary and Recommendations on page 9 provides details for the shapes of the piers for the steel box girder option detailing 5 individual pier shafts 1.2m wide x 3.3m long with no pier cap. As this is a DB Minor project, it is expected that the bridge aesthetic requirements are already finalized in the preliminary design and incorporated in the GA drawing/SDR provided. Would the Ministry please clarify the role of the DB Team in the aesthetic design of the Bradford Bypass County Road 4 Underpass structure as it is expected that the aesthetic details for this project would be incorporated on the other structures for the Bradford Bypass.

Response Details
Response Status
Completed
Response Date
22-Dec-2021 at 11:25:20 AM
Response
The DB Team shall prepare and submit an Aesthetics Report to the Ministry Bridge Aesthetics Evaluation Group (MBAEG) for review, as specified in Clause 2.4.8.5. The Aesthetic Report shall include the proposed aesthetic features for the bridge type selected by the DB Team. The SDR provides details for the shape of the pier considered aesthetically adequate for the steel box girder option. For other acceptable bridge types listed in Clause 2.4.8.2. d), the shape of the pier will be different, and the DB Team shall submit an Aesthetics Report with the proposed aesthetic features.