Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2022-2001-019


Contract Details
Contract Number
2022-2001
Region
Central
Tender Owner
MTO Capital
Location
From Hwy 427 to Islington Avenue, Including Dixon/Martin Grove Interchange
Highway
401
Length
2.576
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical, ATMS and Structural Length: 4.6 Km
Tender Instructions
Contract Dates
Tender Advertise
10-Nov-2021
Tender Opening
20-Jan-2022 at 01:30:00 PM
TRF Submission Opening
23-Dec-2021
TRF Submission Closing
14-Jan-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
09-Dec-2021 at 02:17:14 PM
Type
Contract Drawing
Subject
Conduits for underpass luminaires
Enquiry
Can you please confirm if the conduits for underpass luminaires on drawings 332 and 333 are to be installed as part of the embedded work items or the conduits for the underpass luminaires are existing. It seems that the junction boxes are existing as per typical underpass luminaire wiring diagram shown on drawing 332. This also refers to note 2 but there is note 2 on this drawing.

Response Details
Response Status
Completed
Response Date
22-Dec-2021 at 11:53:45 AM
Response
The conduits for the underpass luminaires are existing. The contractor is to utilize the existing embedded conduit system for the new luminaire installation.