View Enquiry: BE 2021-2124-017


Contract Details
Contract Number
2021-2124
Region
Central
Tender Owner
MTO Capital
Location
FROM 200M SOUTH OF BRADFORD WEST GWILLIMBURY 9th LINE INTERSECTION TO NORTH OF BRADFORD WEST GWILLIMBURY 8th LINE INTERSECTION
Highway
7317
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MINOR: Bradford Bypass – Simcoe County Road 4 (Yonge Street) Underpass.
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: November 9, 2021.
Contract Dates
Tender Advertise
08-Oct-2021
Tender Opening
09-Feb-2022 at 01:30:00 PM
TRF Submission Opening
12-Jan-2022
TRF Submission Closing
04-Feb-2022 at 12:00:00 PM

Enquiry Details
Enquiry Date
02-Dec-2021 at 08:52:37 AM
Type
Other
Subject
Page 91 RFP Document
Enquiry
Can the Ministry please provide the following as per Page 91 of the RFP document: Item b) Ortho Imagery (ACAD/SID/JPEG), Item c) Digital Parcel Ownership Fabric as well as Item e) a Copy of MTO Kardex legal plan index, the MTO P-Plans (TIFF format) within the Project limits and the Engineering and Title Record (ETR) plan plates (TIFF format) within the Project limits? We would also request ACAD of the following: 05>> BBP-CR4-DBR-Draft Reference Concept_2021-11-24, 08>> BBP-CR4-DBR- Final Utility Composite Plan_2021-09-03, 09>> BBP-CR4-DBR-Draft Preliminary Ultimate Concept Interchange_2021-11-24, 10>> BBP-Draft Preliminary BBP Profile at CR4_2021-11-24, 11>> BBP-CR4-DBR-Draft Structural Design Report_2021-11-24 (Appendix B – Structural Alternatives Cross Sections), 11>> BBP-CR4-DBR-Draft Structural Design Report_2021-11-24 (Appendix C – General Arrangement Drawing Recommended Alternative).

Response Details
Response Status
Completed
Response Date
10-Dec-2021 at 03:13:45 PM
Response
Please Refer to Addendum 1, Table C-2. Use of the Ontario Parcel Data other than for this project is not permitted. MTO Geomatics Central does not use Kardex Index. Six P-Plans are being provided with Addendum 1. MTO Geomatics is currently preparing additional P-Plans which will be provided once they are available. The requested ACAD files are being provided with this understanding: "The Design Builder is advised that the ACAD Drawings are not intended as a final design. Stations and dimensions reflect a very preliminary design as drawn but do not imply that the design as shown is constructable without further refinement and/or stages of construction. Reliance on these drawings during bid preparation is done so at the bidders risk".