Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2020-2132-061


Contract Details
Contract Number
2020-2132
Region
Central
Tender Owner
MTO Capital
Location
Highway 400 Northbound and Southbound Lane from South of Dunlop Street to North of Sunnidale Road, and From North of Bayfield Street to North of St. Vincent Street Anne Street Underpass (Site 30X-0347/BO) - 4.2 km
Highway
400
Length
1.5
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural
Tender Instructions
Contract Dates
Tender Advertise
03-Feb-2021
Tender Opening
30-Mar-2021 at 01:30:00 PM
TRF Submission Opening
02-Mar-2021
TRF Submission Closing
26-Mar-2021 at 12:00:00 PM

Enquiry Details
Enquiry Date
17-Mar-2021 at 03:52:41 PM
Type
Contract Quantity Sheet
Subject
Sheet 246
Enquiry
In reference to Sheet 246, Note 6. Piles to be driven to ultimate geotechnical resistance of 3,100 kN per pile but must be driven to or below elevation 205m, and Amendment to OPSS 903 Clause 903.04.02.04.01.1 and 903.07.02.01, as well as the geotechnical information. Should pre-augering be mandatory for all contractors in order to install piles to elevation 205m? This requires driving through approximately 17m of soil exceeding ‘N’ Values of 100.

Response Details
Response Status
Completed
Response Date
22-Mar-2021 at 01:44:49 PM
Response
See response to BE #52.