View Enquiry: BE 2020-2132-039


Contract Details
Contract Number
2020-2132
Region
Central
Tender Owner
MTO Capital
Location
Highway 400 Northbound and Southbound Lane from South of Dunlop Street to North of Sunnidale Road, and From North of Bayfield Street to North of St. Vincent Street Anne Street Underpass (Site 30X-0347/BO) - 4.2 km
Highway
400
Length
1.5
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Granular Base, Hot Mix Paving, Electrical and Structural
Tender Instructions
Contract Dates
Tender Advertise
03-Feb-2021
Tender Opening
30-Mar-2021 at 01:30:00 PM
TRF Submission Opening
02-Mar-2021
TRF Submission Closing
26-Mar-2021 at 12:00:00 PM

Enquiry Details
Enquiry Date
11-Mar-2021 at 04:42:11 PM
Type
Special Conditions
Subject
Operational Constraints
Enquiry
Operational Constraint on page 45 – Surface Course Paving and Final Pavement Markings requires contractor to replace any surface course pavement with temp line markings at their sole cost. Q-Sheets, Staging Typicals (17-30) and Typical Details (161) show traffic at the end of each stage running on surface, requiring contractor to place temp markings on the surface course pavement as per contract. Please confirm traffic will be permitted on binder at the end of each stage and all surface is to placed at the completion of the project. Sheet 22 provides different details for the exact same sections under Stage 2 (Sta 12+133 to Sta 12+503 NB and Sta 12+133 to Sta 12+550SB). Which detail is to be followed? (image attached). 50mm Partial Depth Asphalt Removal is shown in the typical sections for Stage 2 work. The stations indicated on the typical sections do not align with the stations on the Quantity sheets under pay item 42. Please advise.
Attachment(s)

Response Details
Response Status
Completed
Response Date
16-Mar-2021 at 12:43:23 PM
Response
Traffic is permitted on the upper binder course. The bottom typical on sheet 22 is applicable and the stationing will be revised. Contract addendum will be issued.