Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2020-4076-002


Contract Details
Contract Number
2020-4076
Region
Eastern
Tender Owner
MTO Regional
Location
Hwy 115 Northbound - Cavan TWP From 0.14km North of Boundry Road, to 0.27 KM South of Hwy 7A (I/C 40), Southbound - Cavan TWP From 1.55km South of I/C 45, to 0.55km North of Hwy 7A (I/C 40) Hwy 417 Eastbound - Kenyon TWP From 0.33km East of Greenfield Rd Overpass, to 1.5km West of McCrimmon Rd (I/C 35)
Highway
115
Length
28.344
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Concrete Joint Repair
Tender Instructions
Contract Dates
Tender Advertise
15-Jul-2020
Tender Opening
17-Aug-2020 at 11:00:00 AM
TRF Submission Opening
16-Jul-2020
TRF Submission Closing
14-Aug-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
17-Jul-2020 at 03:51:56 PM
Type
Special Conditions
Subject
Lengths and Number of allowable lane closures
Enquiry
Can you please confirm the maximum number of lane closures allowed in each direction, per each highway, along with the maximum length of each lane closure allowed? Please consider the efficiencies required and numerous operations happening within a given lane closure in order to achieve the ministry's schedule.

Response Details
Response Status
Completed
Response Date
04-Aug-2020 at 11:56:22 AM
Response
“Please refer to Addendum #1”