Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2020-4024-009


Contract Details
Contract Number
2020-4024
Region
Eastern
Tender Owner
MTO Capital
Location
Intersection of Highway 17 and County Road 508/County Road 54
Highway
17
Length
1.5
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Design Build: Interim Interchange
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: July 2, 2020
Contract Dates
Tender Advertise
27-May-2020
Tender Opening
05-Nov-2020 at 01:30:00 PM
TRF Submission Opening
08-Oct-2020
TRF Submission Closing
30-Oct-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
02-Jul-2020 at 12:54:29 PM
Type
Other
Subject
Page Limit
Enquiry
Can the Ministry please increase the maximum allowable number of pages from 30 pages to 40 pages based on the minimum font size being Arial 12 point? It is very challenging to address all of the items required in the EOI within the page limit provided.

Response Details
Response Status
Completed
Response Date
07-Jul-2020 at 09:42:49 AM
Response
The Ministry will not be changing the specified page limit.