Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2119-218


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
15-May-2020 at 02:40:43 PM
Type
Other
Subject
MUP
Enquiry
Addendum No. 8 indicates "The surface material of the MUP shall comprise of 40mm Superpave 12.5 in all locations except the MUP between the crossover intersections, where the MUP surface material shall comprise of 175mm concrete." However, the RCD drawings indicate the MUP concrete over the bridge deck is 150 mm. Can the Ministry please confirm if the 175mm concrete depth applies to the section on the bridge deck and/or clarify which areas are considered as the cross over intersections.

Response Details
Response Status
Completed
Response Date
19-May-2020 at 05:00:41 PM
Response
The MUP between crossover intersections shall be comprised of 175mm concrete except over the bridge deck where it shall be comprised of 150mm concrete.