View Enquiry: BE 2019-2119-215


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
15-May-2020 at 02:07:33 PM
Type
Other
Subject
Noise monitoring
Enquiry
Section 1.17.3.4.4 e) of the RFP indicates that the geotechnical/foundation design report shall include “Plan and approach to instrumentation and monitoring including noise and ground vibrations.” The Construction Noise Report (September 12, 2018) included with the RFP did not include a recommendation for further study or noise monitoring. Instead the report states “Although Ontario does not have any applicable regulatory noise level limits for construction noise impacts on noise sensitive areas, construction noise disturbance and potential for complaints can be reduced with the implementation of best practices and other noise control measures.” Can the MTO clarify the reference to noise monitoring in RFP Section 1.17.3.4.4 e) and state explicitly the need for or lack thereof, of a noise monitoring program?

Response Details
Response Status
Completed
Response Date
19-May-2020 at 04:59:08 PM
Response
Noise level monitoring is not required.