View Enquiry: BE 2019-2119-202


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
05-May-2020 at 11:44:59 AM
Type
Other
Subject
Construction Vibration
Enquiry
Addendum 7 includes the following requirement… “No vibration is permitted on Niagara College’s property.” Vibrations will be present in the existing facility which originate from the environmental background, activity of people, equipment associated with that facility, etc. The requirement that “no vibration is permitted” therefore cannot be achieved due to the ongoing existing vibrations. There are criteria for different classes of sensitive equipment which can be used to address vibration impacts during operation. Additionally, the environmental vibration within the vicinity of construction is not anticipated to increase based on the existing environmental background. Therefore, the criteria for assessment should be the higher of an applicable manufacturer, industry or documented technical standard for a class of sensitive equipment or the existing baseline background environmental vibration. Please confirm that the intent of this requirement is to ensure there is a baseline vibration that is not to be exceeded on the Niagara College property during construction (i.e. no additional vibration permitted over the baseline). Will MTO please provide standards that are both achievable and measurable and can be applied equally by all proponents?

Response Details
Response Status
Completed
Response Date
12-May-2020 at 01:49:09 PM
Response
A base line of vibration shall be established from the monitoring equipment installed at the nearest building of Niagara College prior to construction. The piling activities shall not cause any increase of vibration in comparison to the base line.