Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2119-182


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
20-Apr-2020 at 12:04:36 PM
Type
Other
Subject
Content of Design Report for Section ‘Roadway/Traffic Design’
Enquiry
According to RFP, Section 1.17.3.4.2, Bullet Point a), proponent shall provide a report detailing the proposed design for the Highway, and municipal road alterations associated with the Project including, but not limited to: iii. Horizontal alignment (including spiral and curve data tables) and iv. Vertical alignment (including curve data tables). Providing such tables would require significant amount of space which may not be available given that proposal can be only 75 page long (within this page count proponents should incorporate all required drawings including these listed in RFP, Section 1.17.3.4.2, Bullet Point b)). Can MTO please confirm if tables containing horizontal and vertical alignment data can be omitted or (alternatively) provided in New Construction and Profile drawings as it is standard practice?

Response Details
Response Status
Completed
Response Date
29-Apr-2020 at 02:23:44 PM
Response
The maximum page count will not be increased again. Please see the response to bid enquiry 31 for more information about which parts of the technical proposal count towards the page limit, and which parts do not. Please structure your technical proposal and provide a level of detail such that it stays within the page limit requirement.