Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2119-171


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
16-Apr-2020 at 12:51:00 PM
Type
Other
Subject
Utility Relocations
Enquiry
Can MTO please verify that existing buried electric on the west of proposed culvert #04 is in service up to the existing Light Standards only and that it is not leading from the west to the east of the proposed culvert.

Response Details
Response Status
Completed
Response Date
29-Apr-2020 at 10:09:10 AM
Response
Existing lighting circuits end at the existing high mast pole located near approximate Station 9+895, and do not cross Culvert PR-04 from the west to the east. However, it shall be the responsibility of the Design-Builder to verify all existing field conditions. The Design-Builder shall be responsible for all aspects of the electrical design work, which includes temporary, new and removal of buried electrical works. Please refer to the RFP Section 2.4.4.