Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2119-162


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
08-Apr-2020 at 05:06:36 PM
Type
Other
Subject
Carpool Lot
Enquiry
The RFP states "The carpool lot shall accommodate a minimum 100 parking spots, 3 future bus bays, the future relocation of the Ontario Tourism Information Centre, and A-BUS (TAC 2017) vehicle, as shown in the Contract Drawings provided in Appendix C." Could MTO please confirm the specific requirements for the carpool lot to be physically constructed as part of the work under MTO DB 2019-2119? The RFP indicates that the bus bay, Tourism Information Centre and Bus parking are future infrastructure, which will be considered as part of the design, but actual construction will be limited to the 100 parking spots.

Response Details
Response Status
Completed
Response Date
22-Apr-2020 at 02:07:32 PM
Response
Please refer to Contract Drawing Sheet 26 (Reference Document #29B) for what should be constructed as part of the work under MTO DB 2019-2119. The Design-Builder shall be responsible to finalize the detail design to ensure that it meets current MTO standards, including but not limited to Highway Design Bulletin 2007-002.