View Enquiry: BE 2019-2119-150


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
03-Apr-2020 at 04:04:53 PM
Type
Other
Subject
Pavement Design
Enquiry
Page 110 of the RFP states “Design-Builder shall be responsible for developing forecasted traffic volumes for pavement design. All forecasted data and supporting methodology shall be submitted to Contracting Authority for Review in accordance with the Review Procedure.” The Golder Pavement Design Report uses an assumed opening date of 2019.  The RFP requires the Diverging Diamond to be opened to traffic in 2022.  With this deferment and associated background traffic growth applied, the pavement design will change and additional pavement thickness will be required to meet the projected ESAL increase.  Can MTO please confirm that pavement should be designed based on the actual anticipated completion date and thicker pavement should be utilized as determined through revised analysis.

Response Details
Response Status
Completed
Response Date
29-Apr-2020 at 02:19:21 PM
Response
The pavement shall be designed based on the Contract completion date with a design life of 19 years. Therefore, a thicker pavement structure should be utilized as determined through the revised analysis.