View Enquiry: BE 2019-2119-144


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
27-Mar-2020 at 04:42:45 PM
Type
Other
Subject
Enbridge Gas line
Enquiry
In reference to the Utility Contact Information and Status Matrix, the Ministry stated that no Enbridge Gas line relocation is required. The Composite Utility Plan provided shows existing gas lines at various locations as follows: - Passing through proposed culvert extension #6 - Passing through proposed Glendale Avenue East along the curve (shown with five existing Bell Cables) Could the Ministry please clarify the conflicts at these locations and if there has been consideration for the relocation of the Enbridge utilities. Can the Ministry please clarify why there is no relocation indicated in the Utility Contact Information and Status Matrix?

Response Details
Response Status
Completed
Response Date
06-Apr-2020 at 10:27:16 AM
Response
Based on the preliminary design utility conflict matrix, there are no conflicts with Enbridge Gas or Bell at Glendale Ave East. The proposed culvert extension #6 does not extend over the gas line. Minor regrading of the ditch and installation of rip rap at the culvert end is required. Enbridge gas approved the design and reduced clearance at the York Rd/Glendale Ave roundabout. Therefore, no relocation of Enbridge Gas is required.