Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2119-132


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
25-Mar-2020 at 04:58:04 PM
Type
Special Conditions
Subject
Structural
Enquiry
Would MTO please confirm the dimensions of the culvert extension EX-05? Different dimensions are noted in three reference document. RFP states the existing culvert size is 3.5 m x 2.0 m, drainage report states it is a 3 m x 2.7 m culvert, while the Golder foundation report states the culvert size is 3.5 m x 2 m. Would MTO also please provide the structural drawing of the existing culvert?

Response Details
Response Status
Completed
Response Date
01-May-2020 at 02:31:11 PM
Response
The existing culvert is 3m x 2.4m based on the survey information and contract drawings (Document #29A). The Design-Builder shall be responsible for undertaking the hydraulic analysis for all culverts within the study limits and completing the detail design and construction of all culverts. Please refer to addendum 10 (RFP Addendum 7).