View Enquiry: BE 2019-2119-125


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
25-Mar-2020 at 11:49:43 AM
Type
Other
Subject
Freeboard for PR-10 and PR-11
Enquiry
The review of the DBR Drainage Report has determined that the Freeboard calculations for proposed culverts PR-10 and PR-11 has used the Glendale Avenue edge of pavement elevation. Given that the Airport Road/Ramp S-W crosses under Glendale Avenue at this location and that the proposed culverts run parallel to Airport Road/Ramp S-W, the freeboard calculation should have considered the edge of pavement of the Airport Road/Ramp S-W instead of Glendale Avenue. Please confirm that the Airport Road/Ramp S-W edge of pavement elevation should be applied for the freeboard calculation of PR-10 and PR-11 as this will result in larger culverts proposed for these locations.

Response Details
Response Status
Completed
Response Date
02-Apr-2020 at 01:39:08 PM
Response
The Airport Road/Ramp S-W edge of pavement elevation was checked for the freeboard calculations of PR-10 and PR-11. The proposed culvert sizes did not change. The Design-Builder must adhere to all applicable MTO drainage criteria. If there are two or more potentially impacted roadways from culvert headwater elevations, then they must all be checked to determine that they all have adequate freeboard for the appropriate class of roadway and size of culvert. The Design-Builder shall be responsible for undertaking the hydraulic analysis for all culverts within the study limits and completing the detail design and construction of all culverts.