View Enquiry: BE 2019-2119-111


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
11-Mar-2020 at 01:12:26 PM
Type
Special Conditions
Subject
Storm water management
Enquiry
The preliminary design identified a number of OGS units placed a various storm outfall locations. As the background information does not seem to include any sizing requirements or details, please confirm whether the OGS should be sized to accommodate the total pavement area or just the additional pavement area. Please also confirm if MTO and/or the municipality requires a particular OGS manufacturer?

Response Details
Response Status
Completed
Response Date
18-Mar-2020 at 10:50:17 AM
Response
The Design-Builder shall be responsible for the design and construction of three Oil Grit Separator (OGS) stormceptors. The OGS design shall include the total pavement area. MTO and Niagara Region do not endorse any particular manufacturer. The Design-Builder shall ensure that the design meets environmental standards for approval by MECP and Niagara Region.