View Enquiry: BE 2019-2119-085


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
03-Mar-2020 at 10:33:25 AM
Type
Other
Subject
Construction Vibration
Enquiry
The TESR does not address construction vibration except in relation to species-at-risk considerations.  There is no mention of impacts to people, buildings or infrastructure within the TESR.  Conversely, sections 1.17.3.4.4. and 2.4.9.11 of the RFP document mention vibration monitoring in the context of the geotechnical design/monitoring and specifically mentions Niagara College.  However, no standard is put forward for vibration limits, except for the textual reference to sensitive equipment.  The limit provided for sensitive equipment in Section 2.4.9.11 is 50mm/s which would not normally be considered appropriate for sensitive equipment but rather engineered infrastructure.  Section 2.4.9.11 also mentions a pipeline within the same paragraph however, this reference to a pipeline seems somewhat out of place in the text.  Also, the pipeline vibration limit is identified as a displacement of 50 mm when normally pipeline vibration limits are 50mm/s (velocity).  Since the TESR did not address construction vibration, and yet the RFP indicates this may be a concern, will further clarification be provided on vibration impacts, limits and mitigation to guide the contractor during construction?

Response Details
Response Status
Completed
Response Date
01-May-2020 at 02:27:59 PM
Response
Please see addendum 10 (RFP addendum 7).