View Enquiry: BE 2019-2119-077


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
26-Feb-2020 at 02:27:45 PM
Type
Other
Subject
MUP Barrier Transitions
Enquiry
Could the MTO please provide standards for transitions and end treatments for the MUP barrier moving from on the structure to between the structure and the cross-over intersection to MUP without barrier at the cross-over intersection.

Response Details
Response Status
Completed
Response Date
02-Mar-2020 at 01:01:45 PM
Response
The Design-Builder shall design the transitions for the MUP separation parapet walls (SSD 0110-0110) as stated in the RFP. End treatments are shown in the preliminary design (Document# 29); however, the location and design shall be finalized by the Design-Builder.