Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2019-2119-075


Contract Details
Contract Number
2019-2119
Region
Central
Tender Owner
MTO Capital
Location
From 1.8 km West of Glendale Avenue, Easterly to 1.2 km East of Glendale Avenue; Site No. 18X-0161/B0; and Site No. 090200.
Highway
1
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD MAJOR: QEW / Glendale Avenue Interchange Reconstruction
Tender Instructions
EXPRESSION OF INTEREST must be received electronically as prescribed in the Expression of Interest document by 01:30:00 P.M. local time on: October 30, 2019
Contract Dates
Tender Advertise
25-Sep-2019
Tender Opening
28-May-2020 at 01:30:00 PM
TRF Submission Opening
30-Apr-2020
TRF Submission Closing
22-May-2020 at 12:00:00 PM

Enquiry Details
Enquiry Date
24-Feb-2020 at 03:23:44 PM
Type
Special Conditions
Subject
Standards
Enquiry
With reference to WSP’s composite utility plan, the 500mm watermain is crossing the proposed Airport Road Connection S-W loop ramp alignment. Indicated in the RFP page 59, MTO standards shall take precedence over Niagara Region at Airport Road Connection S-W loop ramp. However, this watermain is owned by Niagara Region, which casing requirements (if any) should be followed for this watermain, MTO Standards or Niagara Region Standards? If MTO Standards takes precedence, please provide section in MTO standards indicating casing requirements.

Response Details
Response Status
Completed
Response Date
28-Feb-2020 at 07:51:33 AM
Response
Casing is not required on the watermain based on the preliminary design. However, Niagara Region standards will apply if the successful proponent revises the design that results in the need for casing.