Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2014-3014-039


Contract Details
Contract Number
2014-3014
Region
West
Tender Owner
MTO Capital
Location
Highway 401 Reconstruction and Widening from 0.3 km East of Waterloo Regional Road 8 to 0.1 km West of Waterloo Regional Road 24
Highway
401
Length
5.5
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
Grading, Drainage, Hot Mix Paving, Granular Base, Electrical, Structure Rehabilitation (3) and Structure Replacement (5)
Tender Instructions
Contract Dates
Tender Advertise
04-Feb-2015
Tender Opening
16-Apr-2015 at 03:00:00 PM
TRF Submission Opening
19-Mar-2015
TRF Submission Closing
10-Apr-2015 at 12:00:00 PM

Enquiry Details
Enquiry Date
07-Apr-2015 at 11:29:04 AM
Type
Other
Subject
Add. #3, SP for Item #'s 222 & 350
Enquiry
Addendum #3, Special Provision issued for Protection System - Item No. 222, 350. Regarding installation of inclinometers. The 5th paragraph on Page 51 of Addendum #3, indicated that the inclinometers shall be installed within the filler piles ( assuming part of the shoring walls ), and then indicates that they shall be installed such that initial readings could be obtained a minimum of 1 week prior to first drilling for the installation of the shoring wall. How is this ( 1 week prior ) possible if the inclinometers ( steel casings ) are installed in the filler piles which are part of the shoring wall? Also, the inclinometer steel casing needs to be attached to something reasonably solid/firm to hold them in place, normally the steel of a king pile beam or reinforcing steel cage. Can the inclinometer casing be installed in the king pile caissons and attached to the king pile steel beam? Also, if the inclinometer casing needs to be installed in a caisson which is part of the shoring wall, then can the initial inclinometer readings be taken after the shoring wall is in place, however before the excavation behind the shoring walls begins.

Response Details
Response Status
Completed
Response Date
09-Apr-2015 at 10:50:08 AM
Response
The Contractor shall bid items 222 and 350 in accordance with the Contract Documents.