Enquiry Date
19-Feb-2015 at 01:30:14 PM
Type
General Conditions
Subject
Miscellaneous
1. Please refer to Tender Item List the 4 Bridge titled as Speed River Structure Site No. 33-147 West, 146 West, 147 East and 147 West. Would the directions East and West represent East and West Channels, or East and West Bound Lanes? If they are the former, it does not seem to in-corporate with drawings sheet no. 255 and 284. Please clarify.
2. On page 378 SP for Removal of Concrete, please advise where can we find drawing for Speedville Road Underpass (Site no. 33-145). Are there any item covering its removal?
3. In addendum 1, quantity for item 52 (1500 pipe culvert) is 154 ln. m. which is the same as that of the original form of tender. Please clarify.
4. The 150 mm pipe sub-drain behind Retaining Wall 3 and its footing (sheet 227), is not listed in quantity sheet of item 25. Please clarify its inclusion.