Subject: Response to BE-2014-2002-041 and BE 2014-2002-64: Existing Drainage Reports and Culvert Inspection Reports
With reference to the Ministry’s response to BE-2014-2002-041 and BE-2014-2002-64: The Ministry’s response instructed the bidder to view the requested Drainage Report and Culvert Inspection Reports for the existing infrastructure within the project limits at the Ministry’s Offices.
The Design-Builder has made an appointment and reviewed the material provided at the viewing. For the record, there were no Drainage reports, Culvert Inspection Reports nor Construction Drawings provided that allow the Proponent to verify location, condition or adequacy of the existing drainage infrastructure.
Section 2.4.6.2 (Page 60) of the RFP states “The Design-Builder shall include the existing underground drainage systems in their design and, if necessary, re-design and construct the drainage systems to accommodate the new infrastructure including the new structures at the CPR crossing, Campbell Avenue, Sixteen Mile Creek and Appleby Line.” Can the Ministry please provide this information to allow the Design-Builder to define of the scope of the work required with respect to the drainage infrastructure.