Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2014-2002-077


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
04-Dec-2014 at 09:05:28 PM
Type
Other
Subject
Final Slope of Hwy 401 Shoulder
Enquiry
Does the existing outside shoulder, which connects the highway to the detour widening, need to be reinstated to 6% (to meet Geometric Design Standards for Ontario Highways Manual shoulder cross-fall requirements) after the detour is no longer being utilized and traffic is in final configuration? Or can it remain at 2%? See attached typical section “Final Slope of Shoulder on Hwy 401.pdf” which helps illustrate this bid enquiry question and potential drainage issue.
Attachment(s)

Response Details
Response Status
Completed
Response Date
09-Dec-2014 at 12:48:13 PM
Response
Yes, the outside shoulder shall be reinstated to 6% per the Geometric Design Standards for Ontario Highways Manual for the final condition.