DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
04-Dec-2014 at 08:48:15 AM
Type
Other
Subject
Response to BE-2014-2002-62: Using Fence Line as Existing Right-of-Way Boundary
Enquiry
Part a) With reference to the Ministry’s response to BE-2014-2002-062: Section 2.4.3 of the RFP states “The Design-Builder is responsible for designing and constructing the Project to fit within the current property limits.” Given that the Ministry’s response instructs the Design-Builder keep all the grading / retaining walls within the existing fence lines instead of the property line, and considering that keeping the grading within the existing fence line results in hundreds of meters of permanent retaining wall, we request that the MTO issue an addendum to cover this change in RFP requirement. Part b) OPSD 200.010 requires that the crest and toe of a slope be 1.5m from the right-of-way limit. Since this limit has not been provided is the Design-Builder to assume that the crest and toe of slope need to be 1.5m from the fence line? Or can the Design-Builder construct all walls/grading within the limit of the fence line and still comply, as the response to BE-2014-2002-062 suggests?

Response Details
Response Status
Completed
Response Date
09-Dec-2014 at 01:01:08 PM
Response
The crest and toe of slope shall be 1.5 m from the fence line. See RFP Addendum #4.