View Enquiry: BE 2014-2002-071


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
04-Dec-2014 at 08:44:20 AM
Type
Other
Subject
Response to BE-2014-2002-043 Lane Widths
Enquiry
With reference to the Ministry’s response to BE-2014-2002-043: The existing outside shoulder width is around 1.6m on the bridge structures. Please confirm that it is acceptable to keep the existing shoulder width during staging until traffic is moved onto the newly constructed portions of the structure.

Response Details
Response Status
Completed
Response Date
08-Dec-2014 at 11:10:11 AM
Response
As per Section 2.4.1.5 of the RFP, the minimum lane width on Highway 401 shall be 3.66 m for all stages of construction. A minimum left shoulder width of 0.5 m and a minimum right shoulder width of 2.5 m shall be provided for all stages of construction, except when the existing lane arrangement is maintained (i.e. Stage 1 configuration for non-widened structure as per RFP) where a wider left shoulder is present.