View Enquiry: BE 2014-2002-070


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
04-Dec-2014 at 08:43:58 AM
Type
Other
Subject
Pavement Rehabilitation at Campbell Avenue
Enquiry
The Preliminary Pavement Design Report Document # 20 states “The recommended rehabilitation strategy for Campbell Avenue is 50mm partial depth milling and placement of 50 mm Superpave 12.5 FC2. Should the asphalt be damaged by construction operations, the existing asphalt surface should be removed full depth, graded, as required, and paved with new HMA…”. Please provide the limits of the shave and pave pavement rehabilitation work on Campbell Avenue since it is not stated in the RFP documents.

Response Details
Response Status
Completed
Response Date
08-Dec-2014 at 11:06:56 AM
Response
The pavement rehabilitation limits on Campbell Avenue are 50m left and 50m right of the existing centreline of Highway 401.