View Enquiry: BE 2014-2002-067


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
25-Nov-2014 at 08:47:49 PM
Type
Other
Subject
Pavement Structure
Enquiry
The Preliminary Pavement Design Report used 4-year design ESALs to determine the pavement structure requirements for all Highway 401 pavement widening areas. If the staging duration that will use the temporary highway widening area be limited to two construction seasons, can these pavements be classified as 2-year temporary detours?

Response Details
Response Status
Completed
Response Date
28-Nov-2014 at 02:45:47 PM
Response
No, 4-year design ESALs shall be used to determine the pavement structure requirements as per the RFP requirements.