View Enquiry: BE 2014-2002-054


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
21-Nov-2014 at 11:25:22 AM
Type
Other
Subject
Vertical Clearance at CPR
Enquiry
Section 2.4.1.2 of the RFP states that “At the CPR site, a minimum vertical clearance of 7.01 m is required from the top of the rail to the soffit” Section 2.4.8.2 of the RFP, for CPR structure, it is stated that “vertical clearances shall satisfy the requirements of the Geometric Design Standards for Ontario Highways …” In the GDSOH Section C4.4 page C-4-10 it states that “minimum vertical clearance over railways is 7.2 m measured from the base of the rail” Please clarify if the vertical clearance shall be 7.01m measured from the top of the rail or 7.2m measured from the base of the rail. If it is the latter, could the Ministry please provide the elevation of the base of the rail at the point of minimum clearance for the CPR structure.

Response Details
Response Status
Completed
Response Date
28-Nov-2014 at 02:29:30 PM
Response
Both minimum vertical clearances shall be met – i.e. 7.01m measured from the top of the rail per Transport Canada requirements and 7.2m measured from the base of the rail per the GDSOH. Top and bottom topo shots for the existing railway track within the Ministry’s ROW were included in Document #3 of the RFP provided in Appendix C. The DTM includes the bottom of rail shots only.