Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2014-2002-044


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
20-Nov-2014 at 09:08:40 AM
Type
Other
Subject
Location of Crown on Structures
Enquiry
In the provided General Arrangement of structures (Table C-2, Document #7), crown on structure is shown in the middle of 3.75 m lane for Campbell Avenue East Overpass and Appleby Line Overpass. Section 2.4.8.2 of the RFP indicate crown in the middle of a lane is not permitted. Please confirm the location of crown at each of the 4 structure locations.

Response Details
Response Status
Completed
Response Date
28-Nov-2014 at 02:15:30 PM
Response
The crown shall be located between Lane 2 and Lane 3 for the CPR, Campbell Avenue and Appleby Line Overpass structures. The Sixteen Mile Creek structure is superelevated so there is no crown.