Please wait...
An error occurred while executing an action
(Check error messages on the page)

View Enquiry: BE 2014-2002-043


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
20-Nov-2014 at 09:07:17 AM
Type
Other
Subject
Clarification on Lane widths requirements
Enquiry
Existing lane widths and shoulder shown on staging drawings (Table C-2, Document #26) indicate incorrect existing conditions (lane, shoulder, median). Please confirm whether current lane/shoulder widths of the existing mainline can be maintained during staging until new bridge is constructed.

Response Details
Response Status
Completed
Response Date
28-Nov-2014 at 02:15:04 PM
Response
As per Section 2.4.1.5 of the RFP, the minimum lane width on Highway 401 shall be 3.66 m for all stages of construction. A minimum left shoulder width of 0.5 m and a minimum right shoulder width of 2.5 m shall be provided for all stages of construction.