View Enquiry: BE 2014-2002-037


Contract Details
Contract Number
2014-2002
Region
Central
Tender Owner
MTO Capital
Location
N\A
Highway
401
Length
0
QMS Declaration
Yes
Option A or B bidding
No
Contract Description
DESIGN BUILD - Structural Bridge Replacement
Tender Instructions
EXPRESSION of INTEREST must be received electronically as prescribed in the Expression of Interest document by 1:30:00 P.M. local time on: August 19, 2014.
Contract Dates
Tender Advertise
16-Jul-2014
Tender Opening
11-Dec-2014 at 01:30:00 PM
TRF Submission Opening
13-Nov-2014
TRF Submission Closing
05-Dec-2014 at 12:00:00 PM

Enquiry Details
Enquiry Date
19-Nov-2014 at 08:43:25 AM
Type
Other
Subject
Temporary Illumination for Hwy 401 Detour
Enquiry
Section 2.4.4 of the RFP states “The Design-Builder shall provide temporary illumination for the roads to accommodate traffic Detour Routes and Diversions in accordance with OPSS 106 and Electrical Engineering Manual (MTO)” The PDR staging concept, as presented in Document No. 6 of Table C-1 contains no lane transition areas during construction of the replacement structures. There is also no existing illumination present along Highway 401 at the structures. Based on this there is no need for temporary illumination during the Highway 401 detour work. Please confirm that the MTO has no specific requirements for temporary illumination along the 401 to accommodate traffic detour routes.

Response Details
Response Status
Completed
Response Date
25-Nov-2014 at 03:02:02 PM
Response
For the PDR staging concept, no temporary illumination is required along Highway 401. If an alternate staging strategy is proposed, temporary illumination may be required in accordance with OPSS 106 and the MTO Electrical Engineering Manual.